January 2005 Term
__________
No. 31753
__________
PARKETTE, INC., A WEST VIRGINIA CORPORATION,
Plaintiff Below, Appellant
v.
MICRO OUTDOORS ADVERTISING, LLC,
MORGANTOWN EXCAVATORS INC., AND
CORNERSTONE ENGINEERING, INC.,
Defendants Below, Appellees
AND
MICRO OUTDOORS ADVERTISING, LLC,
MORGANTOWN EXCAVATORS, INC.,
Third-Party Plaintiffs Below, Appellees
v.
TRIAD ENGINEERING, INC., AND TRINITY PRODUCTS, INC.
Third-Party Defendants Below, Appellees
__________________________________________________
Appeal from the Circuit Court of Harrison County
Honorable James A. Matish, Judge
Civil Action No. 01-C-422-3
AFFIRMED
__________________________________________________
Submitted: January 12, 2005
Filed: February 15, 2005
Amy M. Smith, Esq.
Daniel C. Cooper, Esq.
Steptoe & Johnson
Clarksburg, West Virginia
Attorneys for Appellant
Michael G. Gallaway, Esq.
Spilman, Thomas & Battle
Weirton, West Virginia
Attorney for Cornerstone Engineering, Inc.
The Opinion of the Court was delivered PER CURIAM.
2. Summary
judgment is appropriate if, from the totality of the evidence presented, the
record could not lead a rational trier of fact to find for the nonmoving party,
such as where the nonmoving party has failed to make a sufficient showing on
an essential element of the case that it has the burden to prove. Syllabus
Point 2, Williams v. Precision Coil, Inc., 194 W.Va. 52, 459 S.E .2d 329
(1995).
3. If the moving party makes a properly supported motion for summary judgment and can show by affirmative evidence that there is no genuine issue of a material fact, the burden of production shifts to the nonmoving party who must either (1) rehabilitate the evidence attacked by the moving party, (2) produce additional evidence showing the existence of a genuine issue for trial, or (3) submit an affidavit explaining why further discovery is necessary as provided in Rule 56(f) of the West Virginia Rules of Civil Procedure. Syllabus Point 3, Williams v. Precision Coil, Inc., 194 W. Va. 52, 459 S.E.2d 329 (1995).
4. 'The
determination of whether a defendant in a particular case owes a duty to the
plaintiff is not a factual question for the jury; rather the determination of
whether a plaintiff is owed a duty of care by a defendant must be rendered by
the court as a matter of law.' Syllabus point 5, Aikens v. Debow, 208
W.Va. 486, 541 S.E.2d 576 (2000).
Syllabus Point 5, Eastern Steel Constructors, Inc. v. City of Salem,
209 W.Va. 392, 549 S.E.2d 266 (2001).
Per Curiam:
In the instant case, the
appellant, Parkette, Inc. (hereinafter Parkette), filed a complaint
against the appellee, Cornerstone
Engineering, Inc. (hereinafter Cornerstone),
on November 16, 2001. The civil action was also filed against Micro Outdoors
Advertising, LLC., Morgantown Excavators, Inc., and Parker Electric & Sign
Service, Inc.; however, the claims against those companies are not the subject
of the appeal before this Court. Through its complaint, Parkette sought to
recover for damage to its restaurant building allegedly caused by a nearby
outdoor advertising sign which Parkette contended was negligently erected.
On September 5, 2002, Cornerstone filed a motion for summary judgment which
was granted by the Circuit Court of Harrison County on August 8, 2003. Parkette appeals
that order and contends that summary judgment was improper. After reviewing
the facts of the case, the issues presented, and the relevant statutory and
case law, this Court affirms the decision of the circuit court.
On June 5, 2001, Trinity requested that Cornerstone change the design specifications for the sign, including redesigning the specifications of the sign pole and the sign foundation. On June 8, 2001, Cornerstone sent the redesigned sign specifications to Trinity. Included in both designs prepared by Cornerstone were the following instructions:
Footing based on avg. soil_stiff
clay.
We will need confirmation of
the soil conditions for a sign of this size and height.
On June 18, 2001, Trinity ordered Cornerstone's final drawings for the redesigned
sign which were subsequently forwarded to Trinity on July 12, 2001. Cornerstone
then invoiced Trinity a total amount of $307.00 for the final drawings. Cornerstone's
final drawings included the following instructions:
7. The
foundation had been designed assuming the following soil conditions:
Allowable
Lateral Bearing Pressure of 600 psf/ft. (This value is used in cube and auger
footings.)
600
psf/ft corresponds to a stiff clay or equal.
If
soil conditions other than those assumed are encountered (including soft soils,
unstable or collapsing soils, organic materials or ground water) cease excavation
immediately and contact the engineers so that the foundation design can be re-evaluated.
The
installer shall confirm actual soil conditions prior to installation of foundation.
8. If
existing and proposed conditions are not as detailed in this design drawing the
installer shall notify the engineer immediately.
In August 2001, Trinity
contacted Cornerstone and advised it that the excavators digging the sign
foundation encountered a large boulder and could not dig beyond twelve feet
deep, and accordingly requested that Cornerstone redesign the foundation
to accommodate the more shallow foundation depth. Cornerstone thereupon forwarded
new calculations to Trinity based upon the original soil conditions of stiff
clay. Cornerstone states that at no point was it informed that the sign was
being erected on fill material as opposed to stiff clay. At some point after
the sign was erected, the soil beneath and surrounding the Parkette restaurant's foundation substantially settled to a point where
it was asserted that the entire structure was beyond repair requiring complete
replacement of the building.
On November 16, 2001, Parkette filed a civil action against Micro Outdoors Advertising, LLC., Morgantown Excavators, Inc., Parker Electric & Sign Service, Inc., and Cornerstone, seeking to recover for damages to Parkette's restaurant building allegedly caused by the nearby outdoor advertising sign it claimed was negligently erected. Soon afterward, Triad Engineering, Inc., and Trinity Products, Inc., were joined in this action as third-party defendants.
On September 5, 2002, Cornerstone filed a motion for summary judgment pursuant to Rule 56 of the West Virginia Rules of Civil Procedure. At the September 23, 2002, final hearing on Cornerstone's motion for summary judgment, the circuit court found that there was no evidence that Cornerstone owed any duty to Parkette which could form the basis for Parkette to recover damages against Cornerstone and dismissed Cornerstone from the case. On October 3, 2002, Parkette filed a motion for reconsideration, submitting for the first time affidavits from three of its previously designated expert witnesses. Thereafter, on August 8, 2003, the circuit court issued written findings of fact and conclusions of law denying Parkette's motion for reconsideration and memorializing its prior oral ruling granting Cornerstone's motion for summary judgment. This appeal followed.
Moreover, [s]ummary judgment is appropriate if, from the totality of the evidence presented, the record could not lead a rational trier of fact to find for the nonmoving party, such as where the nonmoving party has failed to make a sufficient showing on an essential element of the case that it has the burden to prove. Syllabus Point 2, Williams v. Precision Coil, Inc., 194 W.Va. 52, 459 S.E .2d 329 (1995). In addition, [i]f the moving party makes a properly supported motion for summary judgment and can show by affirmative evidence that there is no genuine issue of a material fact, the burden of production shifts to the nonmoving party who must either (1) rehabilitate the evidence attacked by the moving party, (2) produce additional evidence showing the existence of a genuine issue for trial, or (3) submit an affidavit explaining why further discovery is necessary as provided in Rule 56(f) of the West Virginia Rules of Civil Procedure. Syllabus Point 3, Williams v. Precision Coil, Inc., 194 W. Va. 52, 459 S.E.2d 329 (1995). With these standards in mind, we proceed to consider Parkette's arguments.
Parkette argues that the
circuit court erred in denying its motion for summary judgment and granting
summary judgment in favor of Cornerstone, resulting in a holding that released
Cornerstone from liability with regard to the sign erected on Parkette's
property. Parkette maintains that summary judgment was inappropriate and
that this action is controlled by Eastern Steel Constructors, Inc. v.
City of Salem, 209 W.Va. 392, 549 S.E.2d 266 (2001). Parkette points
out that in Eastern, this Court held that a design professional may
be liable for professional negligence even in the absence of privity of contract.
Parkette further argues that
there are genuine issues of material fact regarding whether Cornerstone was negligent
and whether that negligence proximately caused damage to the Parkette restaurant
structure. Parkette says that Cornerstone was contacted and informed that the
soil conditions did not comport with the design specifications and that Cornerstone
negligently failed to ask any specific questions regarding the composition of
the soil conditions or to make the necessary design changes to avoid the destruction
of the Parkette restaurant structure. Parkette states that Cornerstone's notation
on its design that was sent to Trinity providing, [w]e will need a confirmation
of the soil conditions for a sign of this size and height, demonstrates
that Cornerstone itself recognized that it had an obligation and duty to confirm
soil conditions to prevent damages precisely like those that resulted to the
Parkette restaurant. Finally, Parkette contends that its expert testimony was
adequate to defeat summary judgment.
Conversely, Cornerstone argues that summary judgment was appropriate and contends that Parkette did not demonstrate to the circuit court that there was any evidence, including expert testimony, to support its theory of negligence. As such, Cornerstone says the circuit court correctly concluded that no genuine issue of material fact existed that would lead to the conclusion that Cornerstone had any further duties other than those it performed. Cornerstone further argues that the affidavits of Messrs, Williams, Sausen, and Hill were not properly before the circuit court prior to its oral ruling granting Cornerstone's motion for summary judgment. Cornerstone asserts that it is well-established that a motion for reconsideration does not present a forum for the consideration of evidence which was available but not offered prior to the court's ruling on the summary judgment motion. Cornerstone, citing Powderidge Unit Owners Assoc. v. Highland Properties, Ltd., 196 W.Va. 692, 706, 474 S.E.2d 872, 886 (1996), says that this rule is in place to ensure that litigants who have vigorously and diligently complied with the summary judgment mandates of Rule 56 are not penalized by the action of those who choose not to comply. (See footnote 1)
Cornerstone further contends that Parkette's argument that its expert's deposition demonstrated that an issue of fact existed is without merit. Cornerstone maintains that the only information provided to it with regard to soil conditions was that the excavators on site encountered a large boulder and were unable to dig the foundation beyond twelve feet, not that the soil conditions were different than those assumed. Cornerstone adds that it did not supervise the erection of the sign on site; that it had no right to either inspect or halt the construction; and that it was not retained by Parkette to design the sign or to evaluate soil composition.
After thoroughly reviewing the record and considering all of the parties' arguments, we believe that the circuit court's grant of summary judgment to Cornerstone was proper. Cornerstone established by affirmative evidence that there was no genuine issue of material fact for trial with regard to Parkette's claims against it. In Syllabus Point 5 of Eastern, we said,
The determination
of whether a defendant in a particular case owed a duty to the plaintiff is not
a factual question for the jury; rather the determination of whether a plaintiff
is owed a duty of care by a defendant must be rendered by the court as a matter
of law. (Citations omitted.).
In this case, the circuit court found as a matter of law that Parkette failed
to satisfy its burden that a genuine issue of material fact existed for trial
with respect to whether Cornerstone owed any duty to Parkette. The circuit
court further found that both the written and oral assertions of [Parkette's]
motion for summary judgment are insufficient as a matter of law. Upon
our review of the record, we believe that Parkette's initial and supplemental
written opposition to summary judgment did not dispute or even address any
of the facts or exhibits presented by Cornerstone's motion for summary judgment.
Parkette's only response was by way of written and oral representations of
its counsel, which are insufficient to defeat summary judgment. See Syllabus
Point 3 of Guthrie v. Northwestern Mutual Life Ins. Co., 158 W.Va. 1,
208 S.E.2d 60 (1974) (Summary judgment cannot be defeated on the basis
of factual assertions contained in the brief of the party opposing a motion
for summary judgment for such judgment.); City of Morgantown v. W.Va.
University Medical Corp., 193 W.Va. 614, 620, 457 S.E.2d 637, 643 (1995) (holding plaintiff's assertions
at oral argument insufficient to defeat summary judgment); and Stewart
v. SMC Inc., 192 W.Va. 441, 446- 447, 452 S.E.2d 899, 904-905 (1994)
(holding that plaintiff's written and oral assertions were unsupported by
affidavit or other testimony of record insufficient to defeat summary judgment.).
Moreover, with regard to the deposition testimony of Parkette's expert, Mr. Sausen, we believe that he offered no information that would defeat Cornerstone's motion for summary judgment. In Syllabus Point 9 of Eastern we wrote:
A design
professional (e.g. an architect or engineer) providing plans and specifications
that will be followed by a contractor in carrying out some aspect of a design,
impliedly warrants to the contractor, notwithstanding the absence of privity
of contract between the contractor and the design professional, that such plans
and specifications have been prepared with the ordinary skill, care and diligence
commensurate with that rendered by members of his or her profession.
Initially, we note that Parkette did not provide the circuit court with any
specific testimony that it contended raised a factual issue. In fact, during
the September 23, 2002, final hearing on Cornerstone's motion for summary
judgment, Parkette's counsel, without providing specifics, simply argued
that Mr. Sausen's deposition testimony was critical of Cornerstone and therefore
created a genuine issue of material fact for trial. Nonetheless, the circuit
court requested, considered, and reviewed Mr. Sausen's deposition testimony
and concluded that there was nothing in his testimony to indicate upon which of the parties
the duty may have fallen. Likewise, we have reviewed Mr. Sausen's deposition,
as well as the depositions that were presented by Parkette after the
circuit court ruled against Parkette and during its motion for reconsideration.
Accordingly, we agree with the circuit court that none of the depositions
or any of the evidence presented by Parkette was sufficient to defeat Cornerstone's
motion for summary judgment. In particular, Mr. Sausen did not offer, nor
could he offer, an expert opinion as to whether the sign caused the building
to move as he testified that such a determination would have to be made by
a geo-technical engineer. In fact, Mr. Sausen admitted that it was beyond
his expertise to identify why the soil was moving and he could not attribute
the movement to the placement or construction of the sign. When asked by
Cornerstone's counsel whether there was any problem or any negligence on
the part of Cornerstone and the design of the sign, Mr. Sausen said, I
really wouldn't have a means of determining that.
In this case, from the totality of the evidence presented, the record could not lead a rational trier of fact to find for the nonmoving party, such as where the nonmoving party has failed to make a sufficient showing on an essential element of the case that it has the burden to prove. Syllabus Point 2, Williams v. Precision Coil, Inc. Parkette is correct that a design professional owes some duty of care to a contractor. See Syllabus Point 6, Eastern. Nonetheless, this case is very different from the factual circumstances in Eastern.
That case was a narrowly written case that concluded that because of the special relationship that existed between a contractor and a design professional that are both hired by the same owner, the design professional owed a duty to the contractor and therefore, the contractor could sue the professional for non-economic damages even in the absence of privity of contract. The instant case involves property damages, so it is not a non-economic case as was the situation in Eastern. Additionally, this case does not involve a suit between two parties who were both hired by the same property owner. Here, there are several layers of contracts before you get to Cornerstone. In fact, Parkette did not hire or employ any of the parties. Instead, Parkette entered into a lease agreement for $1,500.00 per year with Micro whereby Micro paid Parkette to allow it to construct a billboard sign on an unused section of Parkette's property. In turn, Micro hired MEI to perform site excavation, hired Parker to erect the sign, and ordered sign parts from Trinity to deliver to Parker. In a separate transaction, Trinity, a Missouri corporation, contacted Cornerstone, a Tennessee corporation, and requested a sign design. The facts of this case simply do not create the same type of special relationship or reliance that created the special relationship referred to in Eastern.
Moreover, even though Parkette
was not the contractor, and even if we assume for the sake of argument that
Cornerstone owed a special duty to Parkette, there simply is no evidence
that Cornerstone breached any such duty to Parkette, the contractor, or any
of the involved parties. Cornerstone was hired by Trinity to design the sign
that was to be placed on Parkette's property. Cornerstone then designed a sign and in its design
specifications to Trinity it clearly stated that such sign specifications
were contingent upon precise soil conditions. Cornerstone instructed Trinity
that if any soil conditions were encountered other than stiff clay, i.e.,
soft soils, unstable or collapsing soils, organic materials or ground water,
that it was to cease excavation immediately and contact the engineers
so that the foundation design can be re-evaluated. It further provided: The
installer shall confirm actual soil conditions prior to installation of foundation
[and that] [i]f the existing and proposed conditions are not as detailed
in this design drawing the installer shall notify the engineer immediately. Nowhere
in the design specifications and nowhere within the pleadings or expert testimony
was any evidence presented to lead a trier of fact to a conclusion holding
Cornerstone liable for a breach of duty with regard to its design of the
sign. Further, it is obvious from the $307.00 total fee for Cornerstone's
design that none of the parties involved with the construction of the sign
expected Cornerstone to travel from Madisonville, Tennessee to Clarksburg,
West Virginia to conduct soil tests. Likewise, there is no evidence that
Cornerstone had the duty or even the authority to supervise or inspect the
erection of the sign. Cornerstone was hired by Trinity to design the sign
and not to oversee the construction of the sign or to evaluate soil composition.
We believe that Cornerstone fulfilled its obligations to Trinity in designing
a sign based upon stiff clay soil conditions. Consequently, the circuit court
properly granted summary judgment to Cornerstone.
Accordingly, for the reasons set forth above, the final order of the Circuit Court of Harrison County entered on August 8, 2003, is affirmed.
Affirmed.